Home › Commercial › Schools
Classrooms, hallways, gyms, and exteriors for schools, planned around the school calendar.
Most school painting happens when students are away: summer, winter break, and spring break. Tell us the dates, and we'll plan the work so the rooms are finished, dry, and put back together before students return.
Offices and summer programs often keep running while the classrooms are empty. We work by wing, keep the occupied areas clear, and use low-odor paints where people are nearby.
Hallways, stairwells, gyms, and cafeterias need finishes that can be scrubbed. We repair the dents and gouges first, because durable paint doesn't hide a damaged wall.
The same crew coats floors in shops and storage rooms and can restripe the parking lot before the school year starts. See walls, floors, and parking lots.
As early as you can. Summer is the busiest time for both school work and house exteriors, so spring isn't too soon to ask for an estimate.
Yes. The planning is the same: tell us when the rooms are empty, and we'll work inside that window.
Free estimate, no obligation, and a real person on the phone. Most estimates are scheduled within a couple of days.